Metering data availability
When metering data is ready and final.
Meterbeheer delivers the metering data of every meter per channel as a feed at its own JSON URL. How fine the intervals are depends on the metering service: usually per quarter hour for electricity and per hour for gas. This manual lists it per metering service. The technical structure of a feed is described in Feed data structure.
When is EDSN data ready?
Meterbeheer requests the metering data from EDSN every day from 00:00. EDSN does not deliver it at a fixed time, so no fixed time can be given. For most connections the data is ready in the course of the morning, for some only later in the day.
Meterbeheer keeps requesting the data until it arrives. As soon as the metering data is in, it is in the feed.
When is the data final?
Small consumption: final right away
The data of small consumption connections (EDSN) is final right away and does not change afterwards. EDSN delivers no corrections once the data is available.
Large consumption: final after 10 days
Metering services for large consumption can still change the data after delivering it. Meterbeheer therefore collects the data of a day again 10 days later and takes over any changes. After that, the metering data of that day is final.
Solar panels: final right away
The metering data of solar panels is final right away and does not change afterwards.